Move, or improve?

The same numbers, side by side, with your figures in them.

Most people run this in their head, and a head usually rounds in one direction. Put the real figures in and look at both columns at once. Every assumption here is yours to change, and none of it is a quote.

Your house today

If you stay and improve it

The all-in number: design, permits, the contractor, and the things that turn up once the walls are open.
60%
Your estimate. It varies by project and by house, and reading it is one of the things I do in person.

If you sell and move

Adjust the assumptions
Commission, title, prep and concessions, as a share of the sale price.
Movers, window coverings, the first year of things you did not plan on.
As a share of the price.
Leave blank to put in everything left from the sale.
Prefilled with this week’s average for the term you pick.
Principal and interest only, so the two columns compare like for like.
Side by side

Enter what the house would sell for, what you owe, a renovation budget and the price of the next home. Both columns appear here.

Get both numbers for your house

The one figure above that is a guess is what your home would sell for. I will replace it with a real value range, built from what has actually closed near you, and send this comparison back with the right number in it.

The Column That Is Not On The Page

Stay. Renovate. Move. Let’s figure out what comes next.

The arithmetic tells you what each answer costs. It cannot tell you whether the house can take the renovation at all, or whether the next one already does what this one would need a contractor to do. That is a walk through the house, and it is the part I have done for 25 years. Here is how I look at it.

Not sure what you could afford on the other side of a move? Run that test first.

Does where you live serve how you live?